News

Delegating UL verification to Came to reduce customer management

30 July 2026

Entrusting UL verification to Came means less internal management and a single technical contact person.

We check that the UL insulation system is compatible with the available materials free of charge.

By delegating UL verification to us, we interface with the inspector directly during inspections.

For the customer, this means less risk, less management and greater production continuity.

REQUEST A FREE VERIFICATION

 

What UL verification is

Underwriters Laboratories is one of the leading international bodies that assesses the safety of electrical products and components. In the electric motor sector, this verification also covers compatibility of all the materials that make up the insulation system to ensure that they are used in accordance with the conditions for which the system has been approved.

 

Free preliminary verification

Before starting production, we at Came analyse the customer’s UL documentation and a sample of their production free of charge. The aim is to verify that the specified materials are actually compatible with those available and with the production processes, and identify any critical issues while it is still possible to take action without impacting times and costs.

 

Delegating UL verification reduces the customer’s workload

When the customer delegates UL verification to us, we become the technical contact during the inspection. We interface directly with the UL inspector, provide the necessary documentation, and immediately handle any requests for clarification or additional verifications. This reduces the activities involving the customer, and provides a single technical contact throughout the process.

 

The benefits for the customer

Entrusting UL verification to us at Came means:

  • reducing internal coordination work,
  • verifying compliance before starting production,
  • identifying any critical issues in advance,
  • simplifying the relationship with the UL inspector,
  • reducing the risk of delays and rework.

 

Less management and more certainty before production

When UL verification is delegated to us at Came, we support the customer from preliminary verification to inspection, thus reducing the activities to be coordinated and the risk of critical issues during production. A single technical contact person simplifies the process, verifies compatibility between specifications, materials and fabrication in advance, and means every verification can be undertaken with greater certainty.

 

REQUEST A FREE VERIFICATION

 

Contact us to request a preliminary verification

 

 

Article by:
Giuliano Bauce
Winding Div. Engineering Department
consulting@came-italy.com
+39 0444 488282